| BID DATE |
CIP# |
TITLE |
DESCRIPTION |
SCHEDULE |
EST BUDGET |
5/15/08
PLANS CURRENTLY AVAILABLE |
3017009-01 |
FY 2009 Sidewalk Repair Program -
Contract No. 1 |
20,500 SF remove and
replace PCC sidewalk; 5,200 SF Parkway Grading and Restoration |
Early Start Date: 7/07/08
Late Start Date: 7/14/08
56 Working Days |
$142,000 |
5/20/08
(IDOT
Letting **) Plans currently available @ IDOT |
301136-03 |
33rd Avenue SW PCC Paving from
west of 18th Street SW to west of 10th Street SW |
4,390 SY 8" PCC
Paving; 25,634 SY 10" PCC Paving plus associated subbase and subdrains;
11,076 CY earthwork; 4,800 SY sidewalk; 1,082 SY PCC driveways; 406 LF
storm sewer (15" & 30" pipe); 3 intakes; 16 intake tops |
Site 1 - 18th St SW and
33rd Ave from BOP to 18th St.
Late Start Date: 8/25/08
30 Working Days (for Oct 2008 Completion)Site 2 - 33rd Ave from
18th St SW to 12th St SW
Approx Start Date: 4/13/09
50 Working Days |
$2,600,000 |
5/20/08
(IDOT Letting**) Plans currently available @ IDOT |
301083-04 |
Edgewood Road SW, from South of
CRANDIC Railroad to North of Prairie Creek, Grading, Drainage and PCC
Paving |
130,681 CY Excavation
(including approx. 124,000 CY Contractor-furnished borrow); 8,401 CY
Topsoil/strip/salvage/spread; 4,285 SY PCC pavement, Class C, Class 3
durability, 9" thick; 908 LF culverts, 24" to 48"; 2,039 SF segmental
retaining wall; 1,887 LF 16" water main; 2,040 LF 30" sanitary sewer; 588
LF 12" sanitary sewer |
Late Start Date: 6/23/08 85
Working Days
Grading to be completed in 2008 |
$2,650,000 |
5/20/08
(IDOT Letting**) Plans currently available @ IDOT |
301587
IDOT# STP-U-1187(685) - - 70-57 |
Wilson Avenue SW
Arlington Street to Stoney Point Road PCC Pavement - Grade and New |
35,778
CY Excavation; 6,086 CY Topsoil respread; 15,859 CY Topsoil strip and
stockpile; 138 LF Precast Concrete Box Culvert; 1,207 LF 15: - 18" Storm
Sewer; 9 Storm Sewer Intakes and Utility access; 754 LF 20" Water Main;
7,192 SY 8" PCC Pavement; 3.3 acres seeding |
Early Start Date: |
$1,040,000 |
5/29/08
Plans currently available |
304160-02 |
NPDES Compliance Improvements for
Various Dry Detention Basins |
Retrofits of 9 public
detention basins - 1,700 LF drain tile; Storm sewer and structure
modifications; 11,000 CY earthwork; seeding including native
grass/wildflowers |
Early Start Date: 7/14/08
Late Start Date: 7/16/0845 Working Days |
$370,000 |
6/5/08
PLANS CURRENTLY AVAILABLE |
635087-02 |
FY 2008 Parkade Repairs |
|
Early Start Date: 7/21/08
Completion Dates:
10/31/08 Exterior Work
12/31/08 Weather Protected Work
3 milestones
|
$836,000 |
6/5/08
PLANS CURRENTLY AVAILABLE |
304278-02 |
Edgewood Road NE from Glass Road
to the Cedar River, Storm Sewer Repair and Ditch Grading |
753 LF of 15" - 60"
storm sewer pipe; ditch grading; backfill and restoration |
Early Start Date: 7/14/08
Late Start Date:7/28/0835 Working Days |
$240,000 |
6/12/08
Plans Currently Available |
304143-02 |
1st Street NW at G Avenue Storm
Sewer Repair |
300 LF of RCP storm
sewer replacement and gate well structure. |
Early Start Date: 7/23/08
Late Start Date: 8/6/0830 Working Days |
$120,000 |
| 6/26/08 |
655156-02 |
21st St SW (west of) from 37th
Ave to 33rd Ave |
2,940 LF of 8'inch
sanitary sewer, 10 manholes and associated surface restoration |
Early Start Date: 8/11/08
Late Start Date: 8/25/0856 Working Days
|
$270,000 |
| |
|
|
|
|
|