Ellis Harbor Electrical Distribution RFB #PUR0318-142; 332013-01
Ellis Harbor Electrical Distribution
RFB #PUR0318-142; 332013-01
Scope of Work:
The work generally consists of replacements of existing meter centers with new meter centers and improvements to the existing system as to restore proper operation. Improvements to the system will enable the removal and off-site storage of meter centers in the event of a flood in Ellis Harbor, Cedar Rapids. The Engineer's opinion of probably construction cost for the work is $347,700.
Issue Date:
July 11, 2018
Pre-Bid Meeting Date:
July 18, 2018
11:00 AM, Ellis Harbor
Submittal Due Date:
August 1, 2018 @ 11:00 AM
City Hall
101 First Street SE
Cedar Rapids, Iowa
Bid Bond:
5% bid bond; 100% payment and performance bonds required from awarded Contractor
Bid Documents:
Notice to Bidders
Project Manual
Attachment E
Addendums:
It is the bidder’s responsibility to review this website for new information and addendums to the original bid.
Bid Results:
This project has been cancelled. This project will be re-bid with revised specifications at a future date.
Ellis Harbor Electrical Distribution
RFB #PUR0318-142; 332013-01
Scope of Work:
The work generally consists of replacements of existing meter centers with new meter centers and improvements to the existing system as to restore proper operation. Improvements to the system will enable the removal and off-site storage of meter centers in the event of a flood in Ellis Harbor, Cedar Rapids. The Engineer's opinion of probably construction cost for the work is $347,700.
Issue Date:
July 11, 2018
Pre-Bid Meeting Date:
July 18, 2018
11:00 AM, Ellis Harbor
Submittal Due Date:
August 1, 2018 @ 11:00 AM
City Hall
101 First Street SE
Cedar Rapids, Iowa
Bid Bond:
5% bid bond; 100% payment and performance bonds required from awarded Contractor
Bid Documents:
Notice to Bidders
Project Manual
Attachment E
Addendums:
It is the bidder’s responsibility to review this website for new information and addendums to the original bid.
Bid Results:
This project has been cancelled. This project will be re-bid with revised specifications at a future date.